Concrete Work Cost in Jacksonville, FL (2026)

Average concrete work in Jacksonville costs $4,000 based on local labor rates, material prices, and 346 recent projects in the Jacksonville metro area.

Close-up of decorative exposed aggregate concrete walkway
Concrete Work · Jacksonville, FL
Budget
$1,300$1,600
  • Standard broom-finished concrete
  • Sidewalks and steps only
  • No decorative finishes
Most common in Jacksonville
Mid-range
$3,300$4,800
$6–$28 / sq ft
  • Stamped or stained concrete
  • Reinforced with rebar
  • Decorative borders
High-end
$10,300$13,100
  • Custom decorative finishes (acid stain, exposed aggregate)
  • Integrated lighting
  • Heated walkways

Estimate your concrete work in Jacksonville

Include in estimate:

Cost breakdown — Jacksonville mid-range concrete work

Concrete material
35%
$1,400
Labor
35%
$1,400
Forming & rebar
12%
$500
Finishing
10%
$400
Removal & haul-off
$300

Jacksonville concrete work costs run about 5% below the national average for the same scope. Constant humidity and intense summer heat shape material choices and timing. Major cost drivers include local labor rates, Florida-specific code requirements, and material availability through regional wholesalers.

What drives concrete work costs in Jacksonville

Jacksonville concrete work pricing reflects local market conditions and Florida-specific factors.

Local market and labor

Jacksonville sits about 5% below the national average for concrete work. Labor accounts for the majority of cost, and rates vary based on contractor availability and seasonal demand.

Climate-driven material selection

Constant humidity and intense summer heat shape material choices and timing. Material choices that work in milder climates may need different specification here.

Permitting and licensing

Florida requires DBPR-issued contractor licenses (Certified or Registered classifications). Permit fees vary $75-$500 depending on scope.

Seasonal scheduling

Top Jacksonville contractors fill peak-season schedules quickly. Booking 2-6 weeks ahead for an off-season start often delivers 10-15% better rates.

Tips to save on your concrete work in Jacksonville

  1. Get at least three itemized bids

    Jacksonville contractor pricing varies meaningfully — line-item comparison across three bids typically reveals 15-25% differences on identical scope.

  2. Source materials regionally

    Jacksonville has access to Florida regional wholesalers. Bypassing retail markup can save 15-30% on materials.

  3. Stack utility rebates and tax credits

    JEA rebates plus federal IRA tax credits can offset $500-$3,000 on qualifying ENERGY STAR upgrades.

  4. Schedule outside peak season

    Booking 4-8 weeks ahead for an off-season start often locks in better rates and faster contractor attention.

  5. Match scope to neighborhood

    Resale ROI varies meaningfully by Jacksonville neighborhood. Premium finishes deliver stronger dollar gains in upper-tier markets.

Local considerations for Jacksonville homeowners

  • Climate considerations

    Constant humidity and intense summer heat shape material choices and timing. Plan for materials and timing that suit the local climate.

  • Licensing and permits

    Florida requires DBPR-issued contractor licenses (Certified or Registered classifications).

  • HOA approvals

    Most master-planned Jacksonville communities have HOA covenants restricting exterior changes, construction hours, and contractor insurance minimums. Verify approval before ordering materials.

Material options and pricing in Jacksonville

Jacksonville concrete work pricing is shaped by material choice. Costs run below the national average locally.

Recommended materials for Jacksonville

For Jacksonville concrete work, choose materials suited to the local climate and your ownership horizon. Quality mid-tier products typically deliver the best value-to-longevity ratio.

What your budget gets you in Jacksonville

Three real-world concrete work scopes at common price points in Jacksonville.

$1,400 budget concrete work — The basic tier

Standard scope using mid-grade materials and minimal customization. Good fit for rental properties or short-term ownership.

$4,000 mid-range concrete work — The full project

Quality materials with proper installation and warranty coverage. Discovery work typically adds 5-10% to scope — build a 10-15% contingency from day one.

$11,400+ high-end concrete work — The premium build

Premium materials, custom design elements, and meticulous installation. Worth-it splurges: durable materials and quality contractor warranty.

How to hire a contractor in Jacksonville

Hiring a contractor for concrete work in Jacksonville requires verifying licensing, insurance, and references.

Verify licensing

Florida requires DBPR-issued contractor licenses (Certified or Registered classifications).

Check insurance

Always request a Certificate of Insurance (COI) naming you as additional insured. Minimum $500,000 general liability is standard; $1 million is preferred.

Get structured bids

Request 3 itemized bids. Bids should reference the contractors license number, insurance, and warranty terms.

Read the contract

Standard payment schedule: 10% deposit, milestone-based progress payments. Never pay more than 50% before substantial work begins. Most jurisdictions allow 3-business-day cancellation for at-home contract signings.

Financing your project in Jacksonville

Most Jacksonville homeowners finance renovation projects with a mix of cash, home equity, and dealer financing.

Home equity options

Jacksonvilles median home value of $310,000 means most homeowners with a few years of equity have $62,000 to $124,000 of tappable equity. HELOCs and home equity loans are typical funding sources for projects above $20,000. HELOC rates trend in the 8-9% range as of 2026.

Personal loans

For projects under $30,000, an unsecured personal loan often makes more sense than a HELOC because closing costs and timeline dont favor home equity for smaller jobs. Personal loan rates run 9-15% depending on credit.

Local rebates and incentives

JEA offers rebates for ENERGY STAR-rated upgrades. Combined with federal IRA tax credits, total subsidies can reach $1,500-$5,000 on qualifying projects.

0% dealer financing

Cabinet manufacturers, window companies, and flooring retailers often promote 0% promotional financing for 12-24 months. Read the fine print — interest is typically deferred (not waived).

How Jacksonville compares

National average
$4,200
Jacksonville
$4,000
-5% vs national avg
Florida average
$4,400
+5% vs national avg
Fort Lauderdale, FL
$4,800
+$800 vs Jacksonville
Miami, FL
$4,700
+$700 vs Jacksonville
Orlando, FL
$4,300
+$300 vs Jacksonville

Typical concrete work timeline in Jacksonville

Layout and forming
Mark area, build forms, install rebar.
1–2 days
Pour and finish
Pour concrete, broom or stamp finish.
1 day
Cure
Cure 7 days before heavy use.
3–7 days
Total
End-to-end for sidewalks and small slabs.
1–2 weeks

Other projects in Jacksonville

Kitchen remodel
$10,700$13,100
Mid-range avg: $33,400
Bathroom remodel
$6,400$7,800
Mid-range avg: $13,000
Roof replacement
$4,700$5,700
Mid-range avg: $11,200
Deck building
$3,600$4,400
Mid-range avg: $10,000
Window replacement
$2,600$3,100
Mid-range avg: $8,000
Flooring installation
$1,300$1,600
Mid-range avg: $4,900
Interior painting
$1,000$1,300
Mid-range avg: $3,600
Exterior painting
$2,100$2,600
Mid-range avg: $4,900
HVAC installation
$3,800$4,700
Mid-range avg: $8,200
Fence installation
$1,500$1,900
Mid-range avg: $4,000
Garage door replacement
$700$800
Mid-range avg: $1,700
Siding replacement
$4,300$5,200
Mid-range avg: $11,900
Basement finishing
$6,800$8,400
Mid-range avg: $20,900
Driveway paving
$2,100$2,600
Mid-range avg: $5,500
Landscaping
$1,300$1,600
Mid-range avg: $5,200
Plumbing repipe
$2,100$2,600
Mid-range avg: $6,200
Electrical panel upgrade
$1,300$1,600
Mid-range avg: $3,000
Insulation
$900$1,000
Mid-range avg: $3,300
Gutter installation
$700$800
Mid-range avg: $2,100
Patio installation
$1,700$2,100
Mid-range avg: $5,200
Cabinet refacing
$2,600$3,100
Mid-range avg: $7,100
Countertop replacement
$1,300$1,600
Mid-range avg: $3,800
Bathroom tile
$900$1,000
Mid-range avg: $3,000
Water heater installation
$700$800
Mid-range avg: $1,900
Septic system
$2,600$3,100
Mid-range avg: $7,100
Solar panel installation
$6,800$8,400
Mid-range avg: $17,600
Home addition
$17,100$20,900
Mid-range avg: $52,200
Basement waterproofing
$1,700$2,100
Mid-range avg: $5,700
Attic conversion
$12,800$15,700
Mid-range avg: $38,000

Nearby cities

Frequently asked questions

Concrete work in Jacksonville averages $4,000 in 2026, about 5% below the national average. Budget jobs start near $1,300; premium work runs $13,100 or more. Constant humidity and intense summer heat shape material choices and timing.