Deck Building Labor Cost in Chicago, IL (2026)

Deck Building labor in Chicago runs $18.30-$43 per sq ft, about 22% above the national average. This is the carpenter labor charge only, separate from materials.

Estimate labor only
Estimated deck building labor
$6,100
Range $3,660 - $8,540
Labor rate: $31 / sq ft
Local index: 1.22x
Labor only. Materials are billed separately.
City labor avg
$31 / sq ft
vs national
+22%
Local carpenter hourly
$40/hr
Screened-in three-season composite deck on a Chicago greystone

A detailed Chicago labor guide for this trade is being prepared. In the meantime, use the calculator above for a local labor-only estimate.

See full deck building cost in Chicago (labor + materials)
Nearby labor costs: New York, NY · Atlanta, GA
All deck building labor costs by city →

Frequently asked questions

Labor for a deck building in Chicago, IL runs $18.30-$43 per sq ft, about 22% above the national average. That covers the carpenter crew's time, not materials.