Concrete Work Labor Cost in San Diego, CA (2026)
Concrete Work labor in San Diego runs $5.28-$13.20 per sq ft, about 32% above the national average. This is the concrete finisher labor charge only, separate from materials.
Estimate labor only
Estimated concrete work labor
$1,848
Range $1,056 - $2,640
Labor rate: $9.24 / sq ft
Local index: 1.32x
Labor only. Materials are billed separately.
City labor avg
$9.24 / sq ft
vs national
+32%
Local concrete finisher hourly
$36/hr
A detailed San Diego labor guide for this trade is being prepared. In the meantime, use the calculator above for a local labor-only estimate.
Nearby labor costs: Los Angeles, CA · Phoenix, AZ
Frequently asked questions
Labor for a concrete work in San Diego, CA runs $5.28-$13.20 per sq ft, about 32% above the national average. That covers the concrete finisher crew's time, not materials.
