Concrete Work Labor Cost in Aurora, IL (2026)

Concrete Work labor in Aurora runs $4.36-$10.90 per sq ft, about 9% above the national average. This is the concrete finisher labor charge only, separate from materials.

Estimate labor only
Estimated concrete work labor
$1,526
Range $872 - $2,180
Labor rate: $7.63 / sq ft
Local index: 1.09x
Labor only. Materials are billed separately.
City labor avg
$7.63 / sq ft
vs national
+9%
Local concrete finisher hourly
$40/hr
Close-up of decorative exposed aggregate concrete walkway

A detailed Aurora labor guide for this trade is being prepared. In the meantime, use the calculator above for a local labor-only estimate.

See full concrete work cost in Aurora (labor + materials)
Nearby labor costs: Chicago, IL · Naperville, IL
All concrete work labor costs by city →

Frequently asked questions

Labor for a concrete work in Aurora, IL runs $4.36-$10.90 per sq ft, about 9% above the national average. That covers the concrete finisher crew's time, not materials.